Infinity Site Solutions

Safety & quality

Planned for the site. Delivered to the agreed scope.

Project-specific planning, qualified operatives and coordination with the principal contractor support the agreed installation works.

Project-specific RAMS

Risk assessments and method statements are prepared for the agreed scope before work begins.

Site-ready operatives

CSCS, IPAF and PASMA-qualified operatives are available to suit the work and access requirements.

Principal-contractor coordination

The team works within site inductions, permits, access controls and the agreed reporting route.

Checks through delivery

Dimensions, interfaces and visible finishes are checked as work progresses, with snags addressed before handover.

Ramp decking, handrails and approach plate beside colour-matched skirting

Scope and specification

Access installed to the agreed specification.

Access geometry, materials and compliance requirements must be based on the project’s agreed drawings and specification. Infinity surveys and installs the package within that defined responsibility, identifying conflicts before work proceeds wherever practicable.

Include drawings, intended use and access requirements with your enquiry so the scope can be assessed before installation.

Discuss your next project

Tell us what needs finishing, where the site is and when you need the team.

Request a quote